Flower Power Milperra

Flower Power Milperra

Flower Power Milperra

Key insights:

  • Design & Installation of all services for new 10,000m2 Bulky goods store and adjacent tenancies.
    Below ground Fire Hydrant and Water service ring main in Fusion Welded Polyethylene pipe and fittings.
  • Below ground tradewaste drainage in HDPE with 2 grease arrestors.
  • Below ground PVC Sewerage Drainage system
  • Rainwater pumps and filtration system
  • Extensive commercial grade irrigation service with 20 zoned areas.
  • Fixture supply & installation

Project Detail

Project
Flower Power Milperra
Client
FDC Constructions
Scope:
Hydraulic & Civil Stormwater services for New Flower Power Store